UWC Technology Sdn Bhd
Project: Convert Existing Core Shell Building (Ground Floor) Into control roomMode: Design and Build including Authority Submission ( Passive & Active)Size: 12000 sqrft

Project: Convert Existing Core Shell Building (Ground Floor) Into control roomMode: Design and Build including Authority Submission ( Passive & Active)Size: 12000 sqrft
Project: Civil,structure,architecture misc workProject Scope: External Painting Water proofing work at Cooling Tower Area Roller shutter repairing Slab rectification K Block Cargo Lift replacement Roofing

Project: Civil,structure,architecture misc workProject Scope: Construct Gas Yard Room Scupper Drain Construction at Schedule Waste Room Door Copping installation at CUB Bollard installation

Project: Design and build scrubber system including authority submissionProject Scope: Air Pollution Control System

Project: Miscellaneous Work Project Scope: P5 Building Bukit Design and Build Smoke Spill System Kulim K2 Plant HVAC Upgrading Existing Plant Electrical and Exhaust Hook Up
Project: Convert existing lab to workshopProject Scope: HVAC & Electrical work Please select an image first to render the grid properly